May
1st
Thu
1st
Building inspectors checked out the underground bunker - before it was used as a prison - and fire safety inspectors checked the incinerator that was used to burn a baby’s body and was metres away from the dungeon. The inspection team pronounced the ventilation shaft safe, gave Mr Fritzl the appropriate stamp and left.


